Friday, 18 October 2013

Production Schedule With Added Times and Dates

Production Schedule

Title: Reach Out

Director and Producer: Kathryn Dowson

Production equipment required:
- Canon Camera
- Tripod
- Leanne Owens will be filming behind the scenes for some of the video
- Extra camera for taking pictures of the location and the set

Crewing Requirements:
Leanne Owens will be in charge of taking behind-the-scenes footage of a camera, which will be her responsibility and both Jessica Hay and Joanne Dowson will be required to turn up on time and have the right props/costumes.

Actors:
Joanne Dowson –Mother
Jessica Hay –Helpless teenager

Crew:
Leanne Owens and Joanne Dowson –camera women for behind-the-scenes

Transport Requirements:
Jessica Hay will be required to meet at the Directors House for the arranged times and dates and transportation will be arranged from their by the director.

Props:
- A mobile phone
- Bottle of whisky
- A rucksack
- Money (for the bus scenes – director will provide this)
- Possibly a notebook/photo album

Dates and Times:
Saturday 26th October
Time: 10am-12pm
- argument between Jess and Mum
- Jess packing bags her bags to leave
- Jess running out of house

Saturday 2nd November
Time: 10am-2pm
- Filming at bus stop and in Durham

Tuesday 5th November
Time: 4pm-5pm
- Jess walking through the woods
- Jess returning home

Saturday 9th/30th November
Extra Dates If Needed

Post Production Requirements
I will need to overlay the music track ‘Reach Out’ and I will then continue to use iMovie to edit my music video.

No comments:

Post a Comment